|
SOUTH OIL COMPANY
REQUISITIONS LIST
CLOSING DATE 1/10/2009 ALL
PARTICIPANTS IN ENQURIES THAT WILL BE RE- ANNOUNCED SHOULD FOLLOW -UP OUR
REQUISITIONS LISTS AND CLOSING DATE ON OUR WEB SITE INSTEAD OF NOTIFICATION
BY FAX OR E-MAIL AND SUBMIT EITHER RENEWED OFFERS OR LETTERS BY WHICH
EXTENDING THE VALIDITY OF THEIR PAYMENT
FOR PARTICIPATION SHOULD BE DONE ONE DAY BEFORE CLOSING DATE .SINCE CLOSING
DATE IS DIDICATED FOR RECEIVING OFFER (S) ONLY FOR
TECHNICAL SPECIFICATION PLEASE VISIT OUR WEB SITE (www.soc-basrah.com OR
www.socbasrah-iq) OTHERWISE, FEEL FREE TO CONTACT US AT
(fpd_southoilco@yahoo.com) |
|||||
|
ANN-NO.
-33- |
|||||
|
SER. |
ENQ.REF. |
SPEC |
NO. OF ITEMS |
NOTE |
MATERIAL NATURE |
|
1 |
ELECTRICAL
CABLE |
1 |
ANNOUNCED 2 |
|
|
|
2 |
LORRY
WITH LIFT CRANE 6 TON CAP. |
1 |
ANNOUNCED 3 |
AMENDED |
|
|
3 |
COMPLETE
KSB CENTRIFUGAL PUMP WITH ELECTRIC MOTOR (SKID MOUNTED) AND S/P |
|
ANNOUNCED 3 |
|
|
|
4 |
HEAVY
MAINTENANCE (MAJOR OVER HAUL) OF ROLLS
ROYCE GAS GENERATOR AT PS1 |
|
ANNOUNCED 3 |
|
|
|
5 |
S/P
FOR P.L.C SIEMENS STEP7 |
|
ANNOUNCED 3 |
|
|
|
6 |
CONDUCTOR
PIPE |
|
ANNOUNCED 2 |
|
|
|
7 |
COMPLETE
KSB PUMP WITH ELECTRIC MOTOR ( SKID MOUNTED) |
|
ANNOUNCED 3 |
|
|
|
8 |
SR
ANALYZER TM-TPH WPRKSTATION |
|
ANNOUNCED 2 |
|
|
|
9 |
CATIONIC
POLYELECTROLYTE |
|
ANNOUNCED 2 |
|
|
|
10 |
CONTROL
PANEL FOR AXSIA HOMMER DESALTING UNIT FOR BNUMAR DEGASSING STATION |
|
ANNOUNCED 2 |
|
|
|
11 |
CONTROL
PANELS FOR DEHYDRATION AND DESALTING UNIT |
|
ANNOUNCED 2 |
|
|
|
12 |
ZERO
HOUR OVERHAULLED EXTERRNAL WHEEL CASE PUMP WITH ALL ATTACHED PARTS FOR ROLLS
ROYCE(AVON) GAS GENERATOR TYPE 153375 G120 AND MUST BE FIT TO ENGINE
S/N:38034, 38213 WITHOUT ANY MODIFICATION |
|
ANNOUNCED 1 |
|
|
|
13 |
HEAVY
MAINTENANCE ( MAJOR OVERHAUL) OF GAS TURBINE GE LM 2500 ( GAS GENERATOR) |
|
ANNOUNCED 1 |
|
|