|
Location project: soth rumaila
The work consist of construction and exchange
the damaged and oldness pipes by new extinguishing pipe net so
that layout external pipe (8")and length (4.5 KM) pipe to be
divided into 65 fireshdrant and fire water monitor
rehabilitation station from fair .
The project manager: Eng. Hyder suidy
Location manager :CH.Eng. Hyder albatat
manager of construction dept
|