God
bestowed on Iraq abundant from blessings and gas was one of
the most important of those riches, but successive
administrations of the company focused its attention on the
oil industries and gas wealth was wasted by burn.
The current management of the company in all areas of
interest ,including oil industry and gas exploitation
because of its great importance as fuel and catalyst in
industries such as fertilizers and petrochemicals and the
efficient management of this pioneering experiment in the
investment of gas of field Zubayer, which was burned upon
since the last century where rehabilitation some special
units by gas treatment units from units was the destroyed
and burnt and was the outcome of this investment ( 65 Mscf
/day)
|
 |

|
Establishment of a new
station:
and transfer equipment
the engineering cadres was built a special place to
equipments the station in Ben omer field, where require
that large civilian works summed up in the burial and
flatten also construction concrete shield , roads the
engineering cadres was built a special place to
equipments the station in Ben omer field, where require
that large civilian works summed up in the burial and
flatten also construction concrete shield , roads for
this equipments. which had been transported to distance
of hundreds from kilometers away from the southern
rumaila field into Ben omer field under controlling the
specialists engineers for this process ( the transfer of
containers and pipes )
of the privacy give the large size , magnitude and
weight as one of the containers more than ( 100 tons) of
ensuring that the maximum precision to arrived the
equipments |
|
|
 |
The
project's stages:-
require investment of gas of field Ben omer equipments
for the treatment of gas and extract from condensates
and water vapor which was saturating the gas and making
conformity with the specifications of exploitation in
Facilities of electrics and industry. our company has
been preparing for this many orders did not make any of
the manufacturers to meet these requirements and
continued quantities of gas burned in vain ,while
increased demand for raw gas to provide liquid gas to
citizens , facilities of industry, catalyst for the
production of fertilizers and petrochemicals.
the company went to the rehabilitation and
reconstruction of the gas processing units where the old
established in 1976 in the southern rumaila and had
suffered serious damage due to
past wars and require that significant engineering
expertise in the reconstruction of all devices and
equipments alternatives to the unit and under the
supervision of our cadres from engineers and was that in
standard period to make such systems are appropriate to
exploitation of gas from Ben omer field
|
|
|
Installion of equipments
The processing
|
disassemble
and re-set up the old and large request the high effort ,
precision and experiences from engineers. So all that works
are implement by soc cadres.
|
| |
Transfer the exploitation gas
|
| |
|
After achieved the construction of
station, showing the need to transfer the
exploitation gas to the local consumption. so the
our company was layout pipeline length (17Km. 14")
by doing all process hot drilling to link with the
main pipes and provide pipeline by all safety and
operation requests was the outcome of this
investment ( 80 Mscf/day)will transfer completely to
the local consumption ( institution industries and
electrics)
|
|
|
|
|